What should an Olympia new-build roofing scope carry from the plans?
The scope should carry the selected roof system, deck preparation, underlayment and junction details from the building design into installation. Changes to the roof shape or openings must stay coordinated with the project documents and responsible permit office.
- Match the roof proposal to the current building plans and selected manufacturer system.
- Name the wall, chimney, skylight and vent details that other trades must coordinate.
How does this connect to the rest of the project?
Replace the whole roof or a defined area, with decking, flashing and the connection to retained materials included in the scope. We identify the adjoining work and agree the sequence with the local contractors involved, so the next trade is ready when its part can begin.
Read the complete new roof installation scope
