What belongs in a gutter installation proposal?
Name the gutter material and profile, measured runs, corners, outlets, downspouts, hangers and cleanup. If guards or a connection to a separate drainage system are included, list those as distinct items.
Where should downspouts discharge?
Choose a route that carries water away from the building without creating a new drainage problem. The proposal should show the outlet location and identify whether underground drainage or grading work is outside the gutter installation.
How does gutter work connect to the roof?
At the eave, the gutter, fascia and roof edge meet. If fascia repair or roof-edge work is needed, include it in the scope or name the trade handoff before installation.

