Which roof junction will the flashing repair open and restore in The Lakes, Lacey?
The scope should identify whether the work meets a wall, chimney, valley, or roof opening. It should show what covering is removed, how the new flashing joins retained materials, and which adjoining finish work belongs to another scope.
Local detail for The Lakes
If flashing work meets a wall or a covered-room roof, list that junction separately from any gutter or downspout work tied to the same repair.
What should the proposal state?
- The wall, chimney, valley, or opening involved
- Covering and wall layers that will be opened
- Any separate masonry, siding, or interior handoff

